Projects

London, UK

Sheraton Park Lane

KIPO were appointed to replace the substation for the Sheraton Grand Park Lane Hotel in Mayfair.

Our services and solutions:

  • Provided a set of scalable floor plans of all the hotel guest bathrooms, calculated the design day steady state heat loss

  • Specified above ceiling fan convector style heater and ceiling supply and return air arrangements

  • Prepared equipment schedule for new heaters and diffusers

  • Conducted a detailed site survey

  • Calculated water content and working pressure

  • Selection and specification of replacement unit

  • Prepared schematics of the water services to show the alterations required

PROJECT DETAILS

Client: Marriott Group

Sector: Hotels and Leisure

Sheraton Park Lane 3.JPG