CLIENT: COFELY ENGIE

MAIN CONTRACTOR: COFELY ENGIE

PROJECT: Excel Energy Centre - Generators & CHP

VALUE: £5m

SECTOR: Energy Centres

LOCATION: Royal Victoria Dock, London

 

Project Description

KIPO was appointed by COFELY to complete the refurbishment of the energy centre for the Excel Centre. The project included the design of 2 new 2mW CHP engines along with medium and low voltage systems. In addition, this project involved the negotiation of a 9/8mW export power agreement with SSE and the incoming grid operator. KIPO were also responsible for designing the new controls systems including BMS systems and providing new lighting and emergency lighting designs.